Procedure for Installing Hardwood
Please note, every job varies, this is just
a typical description of the procedures we do.
- The sub floor [usually plywood] is cleaned
by vacuuming, sweeping, etc...
- Then the subfloor is re-nailed by nailing
along the floor joist to eliminate all squeaks. Then tarpaper
is laid.
- Tarpaper is always laid prior to installation
of hardwood flooring as it acts as a vapor barrier from the floor
beneath it. Red Roslin paper is not used, as it is less absorbent
than tarpaper.
- Flooring is installed with 2 1/4"
staples using a pneumatic staple gun and factory applied glue
on the staples.
- The pneumatic staple gun is run off
of an air compressor to ensure an exceptionally tight-fitting
floor.
- All starter and end pieces are cut at
a 5-degree angle, changing the angle at all times to ensure a
tight fit against the baseboard.
- Floor stock is pre-inspected prior to
laying, for pieces with knots, bad mills, or darker boards.
- Beginning a floor, a select piece of
wood is top nailed into the floor joist, so there is always one-piece
top nailed at the beginning of the job, and one top nailed upon
completion.
- The use of pneumatic nailer is then
incorporated for the remaining floor.
- After installation of the flooring,
filler is made to match the color of the wood. Mixing color tints,
to ensure proper color is matched, does this.
- All nail holes and any imperfections
are then filled with the mixture.
- Your hardwood floor is now ready for
the sanding and finishing process.
- Clear is wood that has very few flaws
or character marks.
- Select has a bright grain, a few flaws,
and most pieces match well.
- No.1 Common has both light and dark
pieces, some marks.
- No.2 Common allows for all character
marks; like knots, wormholes, and discoloration.
|
We install any kind of wood flooring. We
use only the newest equipment, we are fully insured and all of our
references are gladly given upon request! |
| |
|
|